|
| I lowered the ceilling 12 inch's |

|
| The light actually works and so does the fan. |

|
| Why is there sheet rock behind the surround? |

|
| The surround and tub is all in. Yeah |

|
| And the sheetrock go's up. |

|
| More rocking and mudding. Yeah |

|
| With the sanding done, it's time to paint. |

|
| More painting. |

|
| Got to have those spacer's before grouting. |

|
| Got to have shower curtain. |

|
| Pedestal Sink goes in. |

|
| So there it is a brand new bathroom. |

|
So there it is my 2011 project. I did everything myself with the help of my lovely wife. I chose to stay
with the glavaized piping only because it is what I am used to working with. And as for the cost it was right around $1500.
Hope you liked the picture's and feel free to email me if you have any questions.
|
 |
|
|
|
 |
|
| I installed a exhast fan with light. |

|
| Putting the sheet rock on the ceilling. |

|
| Don't ask about the sheet rock behind it. |

|
| Ok now what's next. |

|
| And the mud goes on the seam's. |

|
| Now the sanding begins. Yuck |

|
| Now we have color on the wall's. |

|
| It's tiling time. |

|
| All grouted and sealed. |

|
| A little more lite and yes a mirror will be hung. |

|
| Dual flush toilet. |

|
Enter content here
|
 |
|
|
|